PR 7755 over JACABOA RIVER

Map

Coordinates:
+17.99333, -65.96667
17°59'36" N, 65°58'00" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:PR 7755 over JACABOA RIVER
Structure number:010201
Location:4 MILES S E OF PATILLAS
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:19.0 ft. [5.8 m]
Total length:64.3 ft. [19.6 m]
Roadway width between curbs:14.1 ft. [4.3 m]
Deck width edge-to-edge:15.7 ft. [4.8 m]
Owner:State Highway Agency [01]
Year built:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: May 2017

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:300 [as of 2005]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Pier/abutment protection:In place but re-evaluation of design suggested [4]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Sufficiency rating:27.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$385,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2017FairSatisfactorySatisfactoryFair30027.3
May 2016FairSatisfactorySatisfactoryFair30027.3
May 2015FairSatisfactorySatisfactoryFair30028.2
May 2014FairSatisfactorySatisfactoryFair30028.2
May 2013FairSatisfactorySatisfactoryFair30028.2
June 2011FairSatisfactoryFairFair30027.3
June 2009FairSatisfactoryFairFair30027.3
October 2008PoorImminent FailureImminent Failure-3002.0
December 2007PoorSatisfactorySatisfactoryPoor30045.6
January 2006PoorSatisfactoryFairPoor30035.6
March 2003PoorSatisfactorySatisfactoryPoor30035.6
March 2000FairSatisfactorySatisfactorySatisfactory30058.6
April 1998FairSatisfactorySatisfactorySatisfactory30058.6
April 1996FairSatisfactorySatisfactorySatisfactory30062.4
April 1994FairSatisfactorySatisfactorySatisfactory30067.9
November 1990FairGoodSatisfactorySatisfactory48067.9

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Reinforced Concrete Pier Walllinear ft.1613300
Reinforced Concrete Abutmentlinear ft.69527100
Reinforced Concrete Pile Cap/Footinglinear ft.1613300
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.105782007
Reinforced Concrete Bridge Raillinear ft.105851370
Deck
Reinforced Concrete Slabsq. ft.8077218600
Wearing Surfacessq. ft.710710000