Share:

PR 3 over GRANDE RIVER

Map

Coordinates:
+18.37667, -65.82833
18°22'36" N, 65°49'42" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:PR 3 over GRANDE RIVER
Structure number:011641
Location:1 KM EAST OF RIO GRANDE
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:80.4 ft. [24.5 m]
Total length:166.3 ft. [50.7 m]
Roadway width between curbs:89.6 ft. [27.3 m]
Deck width edge-to-edge:93.8 ft. [28.6 m]
Skew angle:12°
Owner:State Highway Agency [01]
Year built:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: May 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:62,700 [as of 2005]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:79.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$3,393,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2018FairFairGoodGood6270079.0
May 2016FairFairGoodGood6270079.0
May 2014FairFairGoodGood6270079.0
May 2012FairFairGoodGood6270079.0
June 2010FairFairGoodGood6270079.0
March 2008FairSatisfactoryGoodGood6110080.0
June 2006FairFairSatisfactoryGood6110076.2
November 2004FairSatisfactoryGoodGood6110077.2
December 2002FairSatisfactorySatisfactorySatisfactory5760077.2
October 2000FairSatisfactorySatisfactorySatisfactory5390077.2
June 1998FairSatisfactorySatisfactorySatisfactory5390077.2
June 1996FairSatisfactorySatisfactorySatisfactory4250080.0
June 1994FairSatisfactorySatisfactorySatisfactory4130080.0
July 1992FairFairSatisfactorySatisfactory6270079.0
March 1991FairSatisfactoryGoodGood6150080.0

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Girder/Beamlinear ft.2,6612,658300
Deck
Reinforced Concrete Decksq. ft.15,2969,1062,2933,8970
Substructure
Reinforced Concrete Columneach44000
Reinforced Concrete Abutmentlinear ft.2722561600
Reinforced Concrete Pier Caplinear ft.1121021000
Joints
Compression Jointlinear ft.2892630260
Bearings
Elastomeric Bearingeach6406400
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.5024693300