Share:

PR 608 over CIALITOS RIVER

Map

Coordinates:
+18.23833, -66.53333
18°14'18" N, 66°31'60" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:PR 608 over CIALITOS RIVER
Structure number:016551
Location:16.5 KM S W OF CIALES
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:26.9 ft. [8.2 m]
Total length:93.8 ft. [28.6 m]
Roadway width between curbs:26.9 ft. [8.2 m]
Deck width edge-to-edge:31.2 ft. [9.5 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1980
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: April 2017

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:100 [as of 2005]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Sufficiency rating:73.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$636,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
April 2017FairFairFairSatisfactory10073.9
March 2015FairFairFairSatisfactory10074.6
February 2013FairFairFairSatisfactory10071.0
January 2011FairFairSatisfactorySatisfactory10088.0
January 2009FairFairSatisfactorySatisfactory10088.0
May 2007FairFairSatisfactorySatisfactory10088.0
March 2005FairFairSatisfactorySatisfactory10088.0
February 2002FairSatisfactorySatisfactorySatisfactory10090.0
August 1999FairSatisfactorySatisfactorySatisfactory10090.0
May 1997GoodGoodGoodGood10092.0
October 1995GoodGoodGoodGood10092.2
November 1993FairSatisfactoryGoodGood5092.6
February 1992FairSatisfactorySatisfactoryGood5092.6

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Reinforced Concrete Columneach21100
Reinforced Concrete Abutmentlinear ft.3432200
Reinforced Concrete Pile Cap/Footinglinear ft.3333000
Reinforced Concrete Pier Caplinear ft.2121000
Joints
Compression Jointlinear ft.1901900
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.5755200
Deck
Reinforced Concrete Slabsq. ft.2702482110