PR 156 over ARROYATA RIVER
Map
Coordinates:
+18.24167, -66.2050018°14'30" N, 66°12'18" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | PR 156 over ARROYATA RIVER |
Structure number: | 019581 |
Location: | 2.5 KM N E OF COMERIO |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 120.7 ft. [36.8 m] |
Total length: | 335.0 ft. [102.1 m] |
Roadway width between curbs: | 46.3 ft. [14.1 m] |
Deck width edge-to-edge: | 49.9 ft. [15.2 m] |
Owner: | State Highway Agency [01] |
Year built: | 1991 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Number of main spans: | 3 |
Main spans material: | Prestressed concrete [5] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: May 2017
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 3,700 [as of 2005] |
Truck traffic: | 4% of total traffic |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Equal to present minimum criteria [6] |
Deck geometry appraisal: | Superior to present desirable criteria [9] |
Water adequacy appraisal: | Superior to present desirable criteria [9] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge is scour critical; bridge foundations determined to be unstable. [3] |
Sufficiency rating: | 96.8 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Estimated cost of work: | $3,631,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2017 | Fair | Fair | Good | Satisfactory | 3700 | 96.8 |
April 2015 | Fair | Fair | Good | Satisfactory | 3700 | 96.8 |
March 2013 | Fair | Fair | Good | Satisfactory | 3700 | 96.8 |
March 2011 | Fair | Satisfactory | Good | Satisfactory | 3700 | 99.5 |
February 2009 | Fair | Satisfactory | Good | Good | 3700 | 99.5 |
October 2006 | Good | Good | Good | Good | 3700 | 99.5 |
February 2004 | Good | Good | Good | Good | 3700 | 99.5 |
August 2001 | Good | Good | Good | Good | 3700 | 99.5 |
August 1999 | Good | Good | Good | Good | 3700 | 99.5 |
May 1997 | Good | Good | Good | Good | 3700 | 99.5 |
May 1995 | Good | Good | Good | Very Good | 3700 | 99.4 |
April 1993 | Good | Very Good | Very Good | Very Good | 2600 | 99.6 |
September 1991 | Good | Very Good | Very Good | Very Good | 2600 | 99.6 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Prestressed Concrete Girder/Beam | linear ft. | 2,011 | 2,011 | 0 | 0 | 0 |
Deck |
Reinforced Concrete Deck | sq. ft. | 16,695 | 0 | 16,695 | 0 | 0 |
Substructure |
Reinforced Concrete Pier Wall | linear ft. | 72 | 72 | 0 | 0 | 0 |
Reinforced Concrete Abutment | linear ft. | 240 | 233 | 7 | 0 | 0 |
Reinforced Concrete Pile Cap/Footing | linear ft. | 46 | 46 | 0 | 0 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 131 | 131 | 0 | 0 | 0 |
Joints |
Compression Joint | linear ft. | 266 | 161 | 105 | 0 | 0 |
Bearings |
Elastomeric Bearing | each | 36 | 36 | 0 | 0 | 0 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 669 | 662 | 7 | 0 | 0 |