Share:

PR 52 NORTHBOUND over MAJADAS RIVER & PR 712

Map

Coordinates:
+18.03611, -66.24722
18°02'10" N, 66°14'50" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:PR 52 NORTHBOUND over MAJADAS RIVER & PR 712
Structure number:020592
Location:10 KM N E OF SALINAS
Purpose:Carries highway over highway and waterway
Route classification:Principal Arterial - Interstate (Rural) [01]
Tolls:Yes, on toll road [2]
Length of largest span:93.2 ft. [28.4 m]
Total length:387.5 ft. [118.1 m]
Roadway width between curbs:40.7 ft. [12.4 m]
Deck width edge-to-edge:46.6 ft. [14.2 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:State Toll Authority [31]
Year built:1972
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: February 2017

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:20,625 [as of 2005]
Truck traffic:4% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Better than present minimum criteria [7]
Underclearances appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:96.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$839,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
February 2017PoorPoorSatisfactorySatisfactory2062596.0
February 2015PoorPoorSatisfactorySatisfactory2062596.0
February 2013PoorPoorSatisfactorySatisfactory2062596.0
March 2011PoorPoorSatisfactorySatisfactory2062596.0
February 2009PoorPoorFairSatisfactory2075084.8
October 2006PoorPoorSatisfactorySatisfactory1580094.1
March 2003PoorPoorSatisfactorySatisfactory1580094.1
August 1999PoorPoorSatisfactorySatisfactory1580096.2
April 1997FairFairGoodSatisfactory1400096.3
May 1995FairFairSatisfactoryGood1150096.1
March 1993FairFairGoodGood1165096.1
March 1991FairFairGoodGood2155095.4