PR 53 over PR 974 AND DAGUAO RIVER
Map
Coordinates:
+18.25833, -65.6666718°15'30" N, 65°40'00" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | PR 53 over PR 974 AND DAGUAO RIVER |
Structure number: | 024551 |
Location: | 4.5 KM SOUTH OF CEIBA. |
Purpose: | Carries highway over highway and waterway |
Route classification: | Principal Arterial - Other (Rural) [02] |
Tolls: | Yes, on toll road [2] |
Length of largest span: | 121.7 ft. [37.1 m] |
Total length: | 687.4 ft. [209.5 m] |
Roadway width between curbs: | 81.0 ft. [24.7 m] |
Deck width edge-to-edge: | 110.9 ft. [33.8 m] |
Vertical clearance below bridge: | 23.0 ft. [7.0 m] |
Skew angle: | 79° |
Owner: | State Highway Agency [01] |
Year built: | 1996 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Number of main spans: | 6 |
Main spans material: | Prestressed concrete [5] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: May 2017
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 19,235 [as of 2005] |
Truck traffic: | 5% of total traffic |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Better than present minimum criteria [7] |
Deck geometry appraisal: | Superior to present desirable criteria [9] |
Underclearances appraisal: | Superior to present desirable criteria [9] |
Water adequacy appraisal: | Superior to present desirable criteria [9] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 92.0 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2017 | Fair | Fair | Good | Good | 19235 | 92.0 |
May 2015 | Fair | Fair | Good | Good | 19235 | 92.0 |
May 2013 | Fair | Fair | Good | Good | 19235 | 92.0 |
May 2011 | Fair | Satisfactory | Good | Good | 19235 | 93.0 |
May 2009 | Good | Good | Good | Good | 19200 | 93.0 |
October 2007 | Good | Good | Good | Good | 15800 | 93.0 |
November 2005 | Good | Very Good | Good | Good | 15800 | 93.0 |
April 2003 | Good | Very Good | Good | Good | 15300 | 93.0 |
October 2000 | Good | Good | Very Good | Very Good | 15300 | 95.0 |
December 1998 | Good | Good | Good | Good | 9700 | 93.0 |
December 1996 | Good | Very Good | Very Good | Very Good | 9500 | 95.0 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Prestressed Concrete Girder/Beam | linear ft. | 6,873 | 6,830 | 43 | 0 | 0 |
Deck |
Reinforced Concrete Deck | sq. ft. | 55,208 | 18,245 | 36,963 | 0 | 0 |
Substructure |
Reinforced Concrete Column | each | 10 | 10 | 0 | 0 | 0 |
Reinforced Concrete Abutment | linear ft. | 351 | 312 | 39 | 0 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 410 | 374 | 36 | 0 | 0 |
Joints |
Compression Joint | linear ft. | 1,135 | 938 | 197 | 0 | 0 |
Bearings |
Elastomeric Bearing | each | 120 | 120 | 0 | 0 | 0 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 2,717 | 2,701 | 16 | 0 | 0 |