Share:

Off PR-135 km 0.05 over Guayo River

Map

Coordinates:
+18.18222, -66.83417
18°10'56" N, 66°50'03" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:Off PR-135 km 0.05 over Guayo River
Structure number:028951
Location:PR-135 AT km 63.8
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:18.7 ft. [5.7 m]
Total length:39.4 ft. [12.0 m]
Roadway width between curbs:17.4 ft. [5.3 m]
Deck width edge-to-edge:19.4 ft. [5.9 m]
Vertical clearance below bridge:6.6 ft. [2.0 m]
Skew angle:69°
Owner:City or Municipal Highway Agency [04]
Year built:1995
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: April 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:200 [as of 2005]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Sufficiency rating:74.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$14,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
April 2017FairSatisfactorySatisfactoryGood20074.0
March 2016FairSatisfactorySatisfactoryGood20074.0
February 2014FairSatisfactorySatisfactoryGood20074.0
February 2012FairSatisfactorySatisfactoryGood20074.0
March 2010FairSatisfactorySatisfactoryGood20074.0
March 2008FairGoodSatisfactoryGood20074.0

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Reinforced Concrete Abutmentlinear ft.3936300
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.7900079
Reinforced Concrete Bridge Raillinear ft.521910023
Deck
Reinforced Concrete Slabsq. ft.76465601080