Share:

I-95 NB & SB over PUBLIC ST

Map

Coordinates:
+41.80789, -71.40504
41°48'28" N, 71°24'18" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:I-95 NB & SB over PUBLIC ST
Structure number:000000000006510
Location:0.1 Mi W of Allens Av
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:60.0 ft. [18.3 m]
Total length:65.0 ft. [19.8 m]
Roadway width between curbs:131.9 ft. [40.2 m]
Deck width edge-to-edge:141.1 ft. [43.0 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Skew angle:28°
Owner:State Highway Agency [01]
Year built:1958
Year reconstructed:1982
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Main span material:Prestressed concrete [5]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: March 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:167,639 [as of 2015]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Superior to present desirable criteria [9]
Underclearances appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:73.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,656,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
March 2017FairSatisfactoryFairFair16763973.0
April 2015FairSatisfactorySatisfactorySatisfactory16763984.0
April 2013FairSatisfactorySatisfactorySatisfactory16090084.0
April 2011FairGoodSatisfactorySatisfactory16090084.0
April 2009FairGoodSatisfactorySatisfactory16090084.0
April 2007FairGoodSatisfactorySatisfactory16090084.0
February 2004FairGoodSatisfactorySatisfactory16090081.0
March 2002FairGoodSatisfactorySatisfactory16090081.0
April 2000FairGoodSatisfactorySatisfactory16090081.0
March 1998FairGoodSatisfactorySatisfactory16090081.0
February 1996FairGoodGoodSatisfactory16500081.0
February 1994FairGoodGoodSatisfactory16500081.0
February 1992FairSatisfactoryGoodSatisfactory16500075.0

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Girder/Beamlinear ft.1,4881,45312230
Deck
Reinforced Concrete Decksq. ft.9,1609,1005460
Wearing Surfacessq. ft.8,5677,2260691650
Substructure
Reinforced Concrete Abutmentlinear ft.30523038370
Joints
Pourable Jointlinear ft.299000299
Bearings
Elastomeric Bearingeach48024240
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.6565000
Other Material Bridge Raillinear ft.130012730