Share:

S-4-115 over CUFFIE CRK

Map

Coordinates:
+34.65048, -82.71286
34°39'02" N, 82°42'46" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:S-4-115 over CUFFIE CRK
Structure number:000000000007423
Old structure number:000470011500200 (from 1992 edition)
Location:3.9 MI SE PENDLETON
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:15.1 ft. [4.6 m]
Total length:75.1 ft. [22.9 m]
Roadway width between curbs:31.8 ft. [9.7 m]
Deck width edge-to-edge:33.1 ft. [10.1 m]
Owner:State Highway Agency [01]
Year built:1981
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:5
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: December 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:400 [as of 2017]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:88.2

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
December 2018FairSatisfactorySatisfactorySatisfactory40088.2
December 2016FairSatisfactorySatisfactorySatisfactory45088.1
January 2015FairSatisfactorySatisfactorySatisfactory27588.2
January 2013FairSatisfactorySatisfactorySatisfactory32588.2
February 2011FairSatisfactorySatisfactorySatisfactory37588.2
February 2009FairSatisfactorySatisfactorySatisfactory27588.2
June 2007FairGoodGoodSatisfactory35090.7
July 2005FairGoodGoodSatisfactory38090.7
May 1999FairGoodGoodSatisfactory30090.8
May 1991GoodGoodGoodGood20089.5

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Timber Pileeach3636000
Reinforced Concrete Pier Caplinear ft.199199000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.150150000
Deck
Reinforced Concrete Slabsq. ft.2,4902,490000