Share:

SC 802 over LUCY POINT CREEK

Map

Coordinates:
+32.48395, -80.59992
32°29'02" N, 80°35'60" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SC 802 over LUCY POINT CREEK
Structure number:000000000004465
Old structure number:000740080200100 (from 1992 edition)
Location:ON LADYS' ISLAND
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:69.9 ft. [21.3 m]
Total length:490.2 ft. [149.4 m]
Roadway width between curbs:20.3 ft. [6.2 m]
Deck width edge-to-edge:22.0 ft. [6.7 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Owner:State Highway Agency [01]
Year built:1965
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Prestressed concrete [5]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: September 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:4,500 [as of 2015]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:77.6
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,553,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2016FairSatisfactoryGoodSatisfactory450077.6
October 2014FairSatisfactoryGoodSatisfactory340057.6
November 2012FairSatisfactoryGoodSatisfactory330057.6
November 2010FairSatisfactoryGoodSatisfactory320057.6
December 2008FairSatisfactoryGoodSatisfactory320057.6
December 2006FairSatisfactoryGoodSatisfactory280057.6
October 2004GoodGoodGoodGood280057.6
July 1998GoodGoodVery GoodVery Good220057.7
September 1990GoodVery GoodVery GoodVery Good182757.6