Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:S-11-117 over BR OF GILKEY CREEK
Structure number:000000000006438
Old structure number:001170011700100 (from 1992 edition)
Location:4.6MI S GAFFNEY
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:15.1 ft. [4.6 m]
Total length:60.0 ft. [18.3 m]
Roadway width between curbs:31.5 ft. [9.6 m]
Deck width edge-to-edge:33.1 ft. [10.1 m]
Owner:State Highway Agency [01]
Year built:1974
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: November 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:475 [as of 2017]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Sufficiency rating:72.2

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
November 2018FairSatisfactorySatisfactoryFair47572.2
November 2017FairSatisfactorySatisfactoryFair84070.9
November 2016FairSatisfactorySatisfactoryFair47572.2
November 2014FairSatisfactorySatisfactoryFair87570.8
November 2012FairSatisfactorySatisfactoryFair87570.8
December 2010FairSatisfactorySatisfactoryFair87570.8
November 2008FairSatisfactorySatisfactoryFair87570.8
November 2006FairSatisfactorySatisfactoryFair81073.4
December 2004FairSatisfactorySatisfactoryFair74074.6
December 1998GoodGoodGoodGood65085.8
February 1991GoodGoodVery GoodGood25084.5

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Timber Pileeach3025050
Reinforced Concrete Pier Caplinear ft.165165000
Bridge Rail
Other Material Bridge Raillinear ft.120120000
Deck
Reinforced Concrete Slabsq. ft.1,9891,980900