S-11-296 over PEOPLES CREEK

Map

Coordinates:
+35.07403, -81.60764
35°04'27" N, 81°36'27" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:S-11-296 over PEOPLES CREEK
Structure number:000000000005681
Old structure number:001170029600100 (from 1992 edition)
Location:CITY OF GAFFNEY
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:15.1 ft. [4.6 m]
Total length:60.0 ft. [18.3 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:27.6 ft. [8.4 m]
Owner:State Highway Agency [01]
Year built:1970
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 9 / H 10 [1]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Precast Panels [2]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:1,450 [as of 2017]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Sufficiency rating:62.6

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2018FairSatisfactorySatisfactorySatisfactory145062.6
October 2017FairSatisfactorySatisfactorySatisfactory145062.6
October 2016FairSatisfactorySatisfactorySatisfactory200062.4
October 2015FairSatisfactorySatisfactorySatisfactory200062.7
October 2014FairSatisfactorySatisfactorySatisfactory192062.8
October 2013FairSatisfactorySatisfactorySatisfactory192062.8
November 2012FairSatisfactorySatisfactorySatisfactory192060.8
November 2011FairSatisfactorySatisfactorySatisfactory192060.8
November 2010FairSatisfactorySatisfactorySatisfactory192060.8
November 2009FairSatisfactorySatisfactorySatisfactory192060.8
November 2008FairSatisfactorySatisfactorySatisfactory192060.8
November 2007FairSatisfactorySatisfactorySatisfactory192060.8
November 2006FairSatisfactorySatisfactorySatisfactory192060.8
November 2005FairSatisfactorySatisfactorySatisfactory192060.8
November 1999FairSatisfactorySatisfactorySatisfactory168061.0
January 1991FairSatisfactoryGoodGood40067.1

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Timber Pileeach2525000
Reinforced Concrete Pier Caplinear ft.138138000
Bridge Rail
Other Material Bridge Raillinear ft.120120000
Deck
Reinforced Concrete Slabsq. ft.1,65001,65000