Share:

SC 151 over LITTLE SANDY CREEK

Map

Coordinates:
+34.53750, -80.34698
34°32'15" N, 80°20'49" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SC 151 over LITTLE SANDY CREEK
Structure number:000000000000230
Old structure number:001340015100300 (from 1992 edition)
Location:7.1 MI N OF MCBEE
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:9.8 ft. [3.0 m]
Total length:23.0 ft. [7.0 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:149.9 ft. [45.7 m]
Owner:State Highway Agency [01]
Year built:1926
Year reconstructed:2001
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: November 2017

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:7,300 [as of 2017]
Truck traffic:8% of total traffic
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:79.9
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$99,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
November 2017Good7 out of 10730079.9
December 2015Good7 out of 10590090.5
December 2013Good7 out of 10630090.2
December 2011Good7 out of 10660081.9
December 2009Good7 out of 10650082.0
December 2007Good7 out of 10610082.4
December 2005Good7 out of 10540082.9
December 1999Good7 out of 10560083.0
October 1991Good8 out of 10428184.0

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Reinforced Concrete Culvertlinear ft.430430000