Share:

C-13-113 over THOMPSON CREEK

Map

Coordinates:
+34.68407, -79.99119
34°41'03" N, 79°59'28" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:C-13-113 over THOMPSON CREEK
Structure number:000000000008730
Old structure number:001390011300100 (from 1992 edition)
Location:6.5 MI SE CHESTERFIELD
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:29.9 ft. [9.1 m]
Total length:89.9 ft. [27.4 m]
Roadway width between curbs:26.2 ft. [8.0 m]
Deck width edge-to-edge:27.6 ft. [8.4 m]
Owner:County Highway Agency [02]
Year built:1994
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Precast Panels [2]
Wearing surface:Wood or Timber [7]

Latest Available Inspection: January 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:126 [as of 2017]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:70.2

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
January 2018FairSatisfactorySatisfactorySatisfactory12670.2
January 2016FairSatisfactorySatisfactorySatisfactory12670.1
January 2014FairSatisfactorySatisfactorySatisfactory12670.1
January 2012FairSatisfactorySatisfactorySatisfactory12670.1
January 2010FairSatisfactorySatisfactoryGood12670.1
January 2008FairSatisfactorySatisfactoryGood12670.1
January 2005FairSatisfactorySatisfactoryGood12070.1
January 1999GoodGoodGoodVery Good6071.3

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Girder/Beamlinear ft.900900000
Deck
Reinforced Concrete Decksq. ft.2,4752,475000
Substructure
Steel Pileeach2020000
Reinforced Concrete Pier Caplinear ft.112112000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.180180000