US 78 over POLK SWAMP
Map
Coordinates:
+33.20020, -80.6296333°12'01" N, 80°37'47" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | US 78 over POLK SWAMP |
Structure number: | 000000000001621 |
Old structure number: | 001820007800200 (from 1992 edition) |
Location: | 4 MI NW OF ST GEORGE |
Purpose: | Carries highway over waterway |
Route classification: | Principal Arterial - Other (Rural) [02] |
Length of largest span: | 27.9 ft. [8.5 m] |
Total length: | 102.0 ft. [31.1 m] |
Roadway width between curbs: | 25.9 ft. [7.9 m] |
Deck width edge-to-edge: | 28.9 ft. [8.8 m] |
Owner: | State Highway Agency [01] |
Year built: | 1949 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 13.5 / HS 15 [3] |
Number of main spans: | 4 |
Main spans material: | Concrete continuous [2] |
Main spans design: | Slab [01] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: April 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 4,900 [as of 2017] |
Truck traffic: | 8% of total traffic |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge is scour critical; bridge foundations determined to be unstable. [3] |
Sufficiency rating: | 50.0 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $651,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
April 2018 | Fair | Fair | Fair | Good | 4900 | 50.0 |
April 2016 | Fair | Fair | Fair | Good | 3600 | 50.4 |
May 2014 | Fair | Fair | Fair | Good | 4600 | 50.1 |
July 2012 | Fair | Fair | Fair | Good | 4700 | 50.0 |
June 2010 | Fair | Fair | Fair | Good | 4600 | 50.1 |
May 2008 | Fair | Fair | Fair | Good | 5500 | 49.8 |
July 2006 | Fair | Fair | Fair | Good | 5400 | 49.8 |
April 2004 | Fair | Satisfactory | Satisfactory | Good | 5800 | 61.1 |
March 1998 | Fair | Satisfactory | Satisfactory | Very Good | 5400 | 59.3 |
March 1990 | Good | Good | Very Good | Very Good | 3816 | 75.3 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Substructure |
Reinforced Concrete Pile | each | 25 | 25 | 0 | 0 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 145 | 145 | 0 | 0 | 0 |
Joints |
Pourable Joint | linear ft. | 87 | 87 | 0 | 0 | 0 |
Bearings |
Elastomeric Bearing | each | 5 | 5 | 0 | 0 | 0 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 204 | 204 | 0 | 0 | 0 |
Deck |
Reinforced Concrete Slab | sq. ft. | 2,958 | 2,866 | 0 | 92 | 0 |