Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:S-28-97 over BEAVER DAM CREEK
Structure number:000000000002568
Old structure number:002870009700100 (from 1992 edition)
Location:3MI NW LUGOFF
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:14.1 ft. [4.3 m]
Total length:126.0 ft. [38.4 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:25.3 ft. [7.7 m]
Owner:State Highway Agency [01]
Year built:1957
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 9 / H 10 [1]
Number of main spans:9
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: March 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:390 [as of 2017]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Sufficiency rating:64.1

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
March 2018FairSatisfactorySatisfactoryGood39064.1
March 2016PoorSatisfactorySatisfactoryPoor39039.9
March 2014FairSatisfactorySatisfactoryGood39064.1
March 2012FairSatisfactorySatisfactoryGood39063.1
March 2011FairSatisfactorySatisfactoryGood39063.1
March 2010FairSatisfactorySatisfactoryGood39063.1
April 2009FairSatisfactorySatisfactorySatisfactory39063.1
April 2008FairSatisfactorySatisfactorySatisfactory39063.1
April 2007FairSatisfactorySatisfactorySatisfactory39063.1
April 2006FairSatisfactorySatisfactorySatisfactory14067.7
April 1999FairSatisfactorySatisfactoryFair14032.0
April 1991FairGoodGoodSatisfactory22572.1

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Steel Columneach55000
Timber Pileeach47173000
Reinforced Concrete Pier Caplinear ft.254250400
Bridge Rail
Other Material Bridge Raillinear ft.252248400
Deck
Reinforced Concrete Slabsq. ft.3,2002,0781,12200