Share:

S-31-220 over TRIB SCAPE ORE SWAMP

Map

Coordinates:
+34.22081, -80.39286
34°13'15" N, 80°23'34" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:S-31-220 over TRIB SCAPE ORE SWAMP
Structure number:000000000004364
Old structure number:003170022000100 (from 1992 edition)
Location:9 MI W BISHOPVILLE
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:15.1 ft. [4.6 m]
Total length:44.9 ft. [13.7 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:27.6 ft. [8.4 m]
Owner:State Highway Agency [01]
Year built:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 9 / H 10 [1]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Precast Panels [2]
Wearing surface:Bituminous [6]

Latest Available Inspection: August 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:210 [as of 2017]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:73.1

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
August 2018FairSatisfactorySatisfactorySatisfactory21073.1
August 2017FairSatisfactorySatisfactorySatisfactory21073.1
August 2016FairSatisfactorySatisfactorySatisfactory21073.1
August 2015FairSatisfactorySatisfactorySatisfactory21073.1
August 2014FairGoodGoodSatisfactory19373.1
August 2013FairGoodGoodSatisfactory21073.1
July 2012FairGoodGoodSatisfactory21073.1
July 2011FairGoodGoodSatisfactory21072.1
July 2010FairGoodGoodSatisfactory21072.1
August 2009FairSatisfactorySatisfactorySatisfactory21072.1
July 2008FairSatisfactorySatisfactorySatisfactory21072.1
July 2007FairGoodGoodSatisfactory20172.1
August 2006FairFairFairSatisfactory19061.1
August 2005FairFairFairSatisfactory11061.2
August 1999GoodGoodGoodGood11072.4
July 1991FairGoodGoodSatisfactory11072.2

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Timber Pileeach2051320
Reinforced Concrete Pier Caplinear ft.110102800
Bridge Rail
Other Material Bridge Raillinear ft.9090000
Deck
Reinforced Concrete Slabsq. ft.1,2331,02920400