S-31-300 over SCAPE ORE CREEK

Map

Coordinates:
+34.23002, -80.40129
34°13'48" N, 80°24'05" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:S-31-300 over SCAPE ORE CREEK
Structure number:000000000006155
Old structure number:003170030000100 (from 1992 edition)
Location:9 MI W BISHOPVILLE
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:15.1 ft. [4.6 m]
Total length:44.9 ft. [13.7 m]
Roadway width between curbs:31.5 ft. [9.6 m]
Deck width edge-to-edge:32.8 ft. [10.0 m]
Owner:State Highway Agency [01]
Year built:1972
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 9 / H 10 [1]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Precast Panels [2]
Wearing surface:Bituminous [6]

Latest Available Inspection: August 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:30 [as of 2017]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Better than present minimum criteria [7]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:74.2

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
August 2018FairSatisfactorySatisfactorySatisfactory3074.2
August 2017FairSatisfactorySatisfactorySatisfactory3074.2
August 2016FairGoodGoodSatisfactory3074.2
August 2015GoodGoodGoodGood3074.2
August 2014GoodGoodGoodGood2874.2
August 2013GoodGoodGoodGood12074.2
July 2012GoodGoodGoodGood12074.2
July 2011GoodGoodGoodGood6073.2
July 2010GoodGoodGoodGood6073.2
August 2009GoodGoodGoodGood6073.2
July 2008GoodGoodGoodGood6073.2
July 2007GoodGoodGoodGood5873.2
August 2006GoodGoodGoodGood6073.2
August 2005GoodGoodGoodGood12073.2
August 1999GoodGoodGoodGood6073.4
July 1991GoodGoodGoodGood5073.2

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Timber Pileeach2441280
Reinforced Concrete Pier Caplinear ft.132128400
Bridge Rail
Other Material Bridge Raillinear ft.9085500
Deck
Reinforced Concrete Slabsq. ft.1,4811,17530600