S-32-1310 over TRIB TO BEAR CR

Map

Coordinates:
+34.17128, -81.38943
34°10'17" N, 81°23'22" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:S-32-1310 over TRIB TO BEAR CR
Structure number:000000000006730
Old structure number:003270131000100 (from 1992 edition)
Location:2 MI W CHAPIN
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:15.1 ft. [4.6 m]
Total length:44.9 ft. [13.7 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:27.6 ft. [8.4 m]
Owner:State Highway Agency [01]
Year built:1975
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 9 / H 10 [1]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:570 [as of 2017]
Truck traffic:6% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:57.5

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2018FairFairFairSatisfactory57057.5
October 2017FairFairFairSatisfactory57057.5
October 2016FairSatisfactorySatisfactorySatisfactory57068.5
October 2015FairSatisfactorySatisfactoryGood57068.5
October 2014FairSatisfactorySatisfactoryGood57068.5
October 2013FairSatisfactorySatisfactoryGood57068.5
October 2012FairSatisfactorySatisfactoryGood57068.5
October 2011GoodGoodGoodGood57067.5
October 2010GoodGoodGoodGood57067.5
November 2009GoodGoodGoodGood57067.5
December 2008GoodGoodGoodGood57067.5
December 2007GoodGoodGoodGood57067.5
December 2006GoodGoodGoodGood57067.5
December 2005GoodGoodGoodGood55067.5

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Timber Pileeach2001910
Reinforced Concrete Pier Caplinear ft.110105500
Bridge Rail
Other Material Bridge Raillinear ft.9090000
Deck
Reinforced Concrete Slabsq. ft.1,23375747600