Name:US 301 over NORTH EDISTO RIVER
Structure number:000000000002067
Old structure number:003820030100500 (from 1992 edition)
Location:CITY OF ORANGEBURG
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:43.0 ft. [13.1 m]
Total length:291.0 ft. [88.7 m]
Roadway width between curbs:54.1 ft. [16.5 m]
Deck width edge-to-edge:64.3 ft. [19.6 m]
Owner:State Highway Agency [01]
Year built:1922
Year reconstructed:1954
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: December 2017

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:25,800 [as of 2017]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:48.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,145,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
December 2017PoorSatisfactoryPoorPoor2580048.0
December 2015PoorGoodPoorPoor2100048.9
November 2013PoorGoodPoorPoor2430048.3
December 2011PoorGoodPoorPoor2740047.7
February 2010PoorGoodPoorPoor2690047.8
February 2008PoorGoodPoorPoor2670047.8
March 2006PoorGoodPoorPoor2920047.3
March 1998GoodVery GoodGoodGood2750076.4
January 1992GoodVery GoodGoodGood2978476.2

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Girder/Beamlinear ft.2,93001,4651,4650
Deck
Reinforced Concrete Decksq. ft.19,33819,14519300
Wearing Surfacessq. ft.19,33819,338000
Substructure
Prestressed Concrete Columneach4204200
Reinforced Concrete Pier Walllinear ft.2160162540
Reinforced Concrete Abutmentlinear ft.108005454
Reinforced Concrete Pier Caplinear ft.232023200
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.586058600