Share:

142nd Street over Snake Creek

Map

Coordinates:
+45.33067, -98.72477
45°19'50" N, 98°43'29" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:142nd Street over Snake Creek
Structure number:000000023479180
Location:11.1W of Warner
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:48.9 ft. [14.9 m]
Total length:132.9 ft. [40.5 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:26.6 ft. [8.1 m]
Owner:County Highway Agency [02]
Year built:1959
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: May 2017

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:150 [as of 2015]
Truck traffic:3% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:70.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,529,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2017PoorSeriousSatisfactoryFair15070.3
June 2015PoorSeriousSatisfactoryFair15048.1
June 2013PoorSeriousSatisfactoryFair15066.0
July 2011PoorSeriousSatisfactoryFair15060.5
September 2009PoorSeriousSatisfactoryFair15060.5
June 2007PoorPoorSatisfactoryFair15062.5
October 2005PoorPoorSatisfactoryFair15062.5
August 2003FairFairSatisfactorySatisfactory15074.5
August 2001FairFairSatisfactorySatisfactory15074.5
July 1999FairFairSatisfactorySatisfactory15073.6
July 1997FairSatisfactoryVery GoodSatisfactory15073.6
July 1995FairSatisfactoryVery GoodSatisfactory15073.8
July 1993FairSatisfactoryVery GoodSatisfactory15068.7
July 1991FairGoodVery GoodSatisfactory15068.7