180th Street over Trib. to Stray Horse Crk
Map
Coordinates:
+44.77548, -96.9022844°46'32" N, 96°54'08" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | 180th Street over Trib. to Stray Horse Crk |
Structure number: | 000000029291020 |
Location: | 3N & 7.1E of Castlewood |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 10.5 ft. [3.2 m] |
Total length: | 24.0 ft. [7.3 m] |
Roadway width between curbs: | 25.9 ft. [7.9 m] |
Deck width edge-to-edge: | 25.9 ft. [7.9 m] |
Owner: | County Highway Agency [02] |
Year built: | 1935 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Number of main spans: | 2 |
Main spans material: | Steel [3] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Corrugated Steel [6] |
Wearing surface: | Gravel [8] |
Latest Available Inspection: June 2018
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 40 [as of 2016] |
Truck traffic: | 2% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Poor [4 out of 9] |
Substructure condition: | Serious [3 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of replacement [2] |
Deck geometry appraisal: | Equal to present minimum criteria [6] |
Water adequacy appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Roadway alignment appraisal: | Better than present minimum criteria [7] |
Channel protection: | Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
Sufficiency rating: | 39.0 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $514,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
June 2018 | Poor | Satisfactory | Poor | Serious | 40 | 39.0 |
June 2016 | Poor | Satisfactory | Poor | Serious | 40 | 39.0 |
May 2014 | Poor | Satisfactory | Satisfactory | Critical | 40 | 39.0 |
June 2012 | Poor | Satisfactory | Satisfactory | Critical | 40 | 39.0 |
August 2010 | Poor | Satisfactory | Satisfactory | Critical | 40 | 39.0 |
August 2009 | Poor | Fair | Satisfactory | Critical | 40 | 38.0 |