Share:

FAP 1 over TENNESSEE RIVER

Map

Coordinates:
+36.01702, -88.00422
36°01'01" N, 88°00'15" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:FAP 1 over TENNESSEE RIVER
Structure number:03SR0010023
Location:BENTON-HUMPHREYS CO LINE
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:411.1 ft. [125.3 m]
Total length:2207.1 ft. [672.7 m]
Roadway width between curbs:86.0 ft. [26.2 m]
Deck width edge-to-edge:87.9 ft. [26.8 m]
Vertical clearance below bridge:49.2 ft. [15.0 m]
Owner:State Highway Agency [01]
Year built:1989
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:9
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: October 2017

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:5,590 [as of 2017]
Truck traffic:12% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:50.2
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$17,174,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2017FairFairSatisfactoryFair559050.2
February 2016FairFairSatisfactoryFair576063.2
April 2014FairFairSatisfactoryFair552063.2
April 2012FairFairSatisfactoryFair633063.2
June 2010FairFairSatisfactoryFair624063.2
June 2008FairFairSatisfactorySatisfactory594075.2
July 2006FairFairSatisfactorySatisfactory584075.2
August 2004FairFairSatisfactorySatisfactory661082.7
August 2002FairSatisfactorySatisfactorySatisfactory655083.7
March 2001FairSatisfactorySatisfactorySatisfactory655083.7
May 1999FairFairGoodSatisfactory628082.7
April 1997FairFairGoodSatisfactory534082.7
July 1995FairFairGoodSatisfactory594082.8
March 1993FairFairGoodGood558082.8
August 1991FairFairGoodGood526082.8