Share:

FAS 114 over TENNESSEE RIVER

Map

Coordinates:
+35.40550, -88.05628
35°24'20" N, 88°03'23" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:FAS 114 over TENNESSEE RIVER
Structure number:36SR1140001
Location:3 MI. S. WAYNE CO. LINE
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:525.0 ft. [160.0 m]
Total length:2893.5 ft. [881.9 m]
Roadway width between curbs:47.9 ft. [14.6 m]
Deck width edge-to-edge:49.9 ft. [15.2 m]
Vertical clearance below bridge:49.2 ft. [15.0 m]
Owner:State Highway Agency [01]
Year built:1997
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: April 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:2,180 [as of 2017]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:85.5

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
April 2018FairSatisfactorySatisfactorySatisfactory218085.5
June 2016FairSatisfactorySatisfactorySatisfactory192086.8
July 2014FairSatisfactorySatisfactorySatisfactory180087.4
July 2012FairSatisfactorySatisfactoryGood164088.3
August 2010FairSatisfactorySatisfactoryGood204086.2
July 2008FairSatisfactoryGoodGood187087.1
August 2006FairFairGoodGood185086.1
October 2004FairFairGoodGood180086.3
December 2002FairFairGoodGood161087.3
January 2001FairFairVery GoodGood207084.9
November 1998FairFairVery GoodGood96092.7

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.6,0286,028000
Prestressed Concrete Girder/Beamlinear ft.10,1309,859241300
Deck
Reinforced Concrete Decksq. ft.145,845144,8451,00000
Substructure
Reinforced Concrete Columneach1515000
Reinforced Concrete Abutmentlinear ft.100100000
Reinforced Concrete Pier Caplinear ft.720720000
Joints
Strip Seal Jointlinear ft.152152000
Bearings
Movable Bearingeach1515000
Fixed Bearingeach55000
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.5,7885,788000