NFA A132 over SLUE FROM TENNESSEE RIVE

Map

Coordinates:
+35.96111, -83.87611
35°57'40" N, 83°52'34" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:NFA A132 over SLUE FROM TENNESSEE RIVE
Structure number:470A1320001
Location:TO DOWNTOWN AIRPORT ISLAN
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:92.9 ft. [28.3 m]
Total length:274.0 ft. [83.5 m]
Roadway width between curbs:26.6 ft. [8.1 m]
Deck width edge-to-edge:29.9 ft. [9.1 m]
Skew angle:40°
Owner:City or Municipal Highway Agency [04]
Year built:1985
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: April 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:260 [as of 2017]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Sufficiency rating:70.3
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$167,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
April 201670.3GoodGoodVery GoodGood-260
April 201470.3GoodGoodVery GoodGood-260
April 201270.3GoodGoodVery GoodGood-260
April 201086.5GoodGoodVery GoodGood-260
June 200886.5GoodGoodVery GoodGood-260
June 200688.5GoodGoodVery GoodGood-260
July 200488.5GoodGoodVery GoodGood-260
April 200288.5FairGoodVery GoodSatisfactory-260
March 200073.3FairGoodVery GoodSatisfactory-1000
June 199866.7FairGoodVery GoodSatisfactoryFO1000
May 199671.0FairGoodVery GoodSatisfactory-1000
January 199476.0GoodGoodVery GoodGood-1000
March 199276.0GoodGoodVery GoodGood-1000
May 199076.0GoodGoodVery GoodGood-1000