FAS 15 over HARRINGTON CREEK

Map

Coordinates:
+35.20436, -89.86606
35°12'16" N, 89°51'58" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:FAS 15 over HARRINGTON CREEK
Structure number:79002040007
Location:1.6 MI E OF SR204 JCT.
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:12.1 ft. [3.7 m]
Total length:26.9 ft. [8.2 m]
Owner:State Highway Agency [01]
Year built:1952
Year reconstructed:1976
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: February 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:34,420 [as of 2015]
Truck traffic:2% of total traffic
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting. [5]
Scour condition:Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. [2]
Sufficiency rating:56.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$484,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
February 2017Fair5 out of 103442056.0
March 2015Poor4 out of 103026043.0
March 2013Fair6 out of 102960068.5
April 2011Fair6 out of 103149067.7
May 2009Fair6 out of 102821069.2
August 2007Fair6 out of 103368067.0
September 2005Fair6 out of 103666067.0
September 2003Fair6 out of 102536070.5
October 2001Fair6 out of 103288067.0
February 2000Fair6 out of 103382067.0
February 1998Fair6 out of 103085068.0
October 1995Fair6 out of 102885068.9
September 1993Fair6 out of 102835069.1
December 1991Fair6 out of 102685069.8

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Reinforced Concrete Culvertlinear ft.164164000