Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:FAU 2813 over BRANCH
Structure number:79S81000005
Location:WINCHESTER RD - MEMPHIS
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:9.8 ft. [3.0 m]
Total length:23.0 ft. [7.0 m]
Skew angle:15°
Owner:City or Municipal Highway Agency [04]
Year built:1963
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: March 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:21,590 [as of 2017]
Truck traffic:4% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:72.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$541,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
March 2017Fair6 out of 102159072.2
April 2015Fair6 out of 102159072.2
April 2013Fair6 out of 102159072.2
May 2011Fair6 out of 102159072.2
June 2009Fair6 out of 102159072.2
September 2007Fair6 out of 102159072.2
September 2005Fair6 out of 102341071.3
October 2003Fair6 out of 102521070.5
October 2001Fair6 out of 102645070.0
March 2000Fair6 out of 102651069.9
June 1998Fair6 out of 102459070.8
October 1995Good7 out of 102837069.1
October 1993Good7 out of 102821069.2
December 1991Good7 out of 102467070.8

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Reinforced Concrete Culvertlinear ft.282280200