Share:

FAU 2813 over HURRICANE CREEK

Map 

Coordinates:
+35.05250, -89.96667
35°03'09" N, 89°58'00" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:FAU 2813 over HURRICANE CREEK
Structure number:79S81000009
Location:WINCHESTER RD - MEMPHIS
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:33.1 ft. [10.1 m]
Total length:96.1 ft. [29.3 m]
Roadway width between curbs:86.0 ft. [26.2 m]
Deck width edge-to-edge:100.1 ft. [30.5 m]
Owner:City or Municipal Highway Agency [04]
Year built:1965
Year reconstructed:1985
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: March 2017 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:28,530 [as of 2017]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:46.5 tons [42.3 metric tons]
Inventory rating:27.7 tons [25.2 metric tons]
Sufficiency rating:77.9
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$416,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
March 201777.9FairSatisfactorySatisfactorySatisfactory-28530
April 201577.9FairSatisfactorySatisfactorySatisfactory-28530
April 201377.9FairSatisfactorySatisfactorySatisfactory-28530
May 201164.9FairSatisfactorySatisfactoryFair-28530
June 200963.9FairSatisfactorySatisfactoryFair-28530
October 200764.9FairSatisfactoryFairFair-28530
September 200563.7FairSatisfactoryFairFair-31320
October 200362.7FairSatisfactoryFairFair-33940
October 200148.9PoorSatisfactoryFairPoorSD34550
March 200064.9FairSatisfactorySatisfactoryFair-35200
June 199864.9FairSatisfactorySatisfactoryFair-33860
October 199569.0FairSatisfactorySatisfactoryFair-35400
October 199371.0FairSatisfactorySatisfactoryFair-35040
December 199171.0FairSatisfactorySatisfactoryFair-34800