Share:

FAU 2861 over SOUTHERN AVE / LAMAR AVE

Map

Coordinates:
+35.11611, -90.00056
35°06'58" N, 90°00'02" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:FAU 2861 over SOUTHERN AVE / LAMAR AVE
Structure number:79SR0040031
Location:SOUTHERN AVE - MEMPHIS
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:75.1 ft. [22.9 m]
Total length:209.0 ft. [63.7 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:66.6 ft. [20.3 m]
Vertical clearance below bridge:13.8 ft. [4.2 m]
Skew angle:45°
Owner:State Highway Agency [01]
Year built:1959
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: February 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:7,770 [as of 2017]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:88.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$3,185,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
February 201788.0FairSatisfactorySatisfactorySatisfactoryFO7770
March 201588.0FairSatisfactorySatisfactorySatisfactoryFO7770
March 201388.0FairSatisfactorySatisfactorySatisfactoryFO7770
April 201188.0FairSatisfactorySatisfactorySatisfactoryFO7770
May 200987.0FairSatisfactorySatisfactorySatisfactoryFO7770
August 200767.2FairFairFairFairFO7770
September 200565.7FairFairFairFairFO8160
September 200366.6FairFairFairFairFO7410
October 200164.0FairFairFairFairFO9620
February 200062.5FairFairFairFairFO10940
June 199880.1FairSatisfactorySatisfactorySatisfactoryFO7250
September 199578.5FairSatisfactorySatisfactorySatisfactoryFO7900
August 199379.2FairSatisfactorySatisfactorySatisfactoryFO7150
December 199180.8FairSatisfactorySatisfactorySatisfactoryFO5500