Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | NFA A052 over SPIVEY CREEK |
Structure number: | 860A0520001 |
Location: | S. OF SR 36 |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 38.4 ft. [11.7 m] |
Total length: | 41.3 ft. [12.6 m] |
Roadway width between curbs: | 13.5 ft. [4.1 m] |
Deck width edge-to-edge: | 16.1 ft. [4.9 m] |
Owner: | County Highway Agency [02] |
Year built: | 1978 |
Historic significance: | Historical significance is not determinable at this time [4] |
Design load: | M 13.5 / H 15 [2] |
Main span material: | Steel [3] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Corrugated Steel [6] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: August 2018
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 30 [as of 2019] |
Truck traffic: | 5% of total traffic |
Deck condition: | Poor [4 out of 9] |
Superstructure condition: | Poor [4 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Water adequacy appraisal: | Better than present minimum criteria [7] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 40.1 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $529,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
August 2018 | Poor | Poor | Poor | Satisfactory | 30 | 40.1 |
August 2016 | Poor | Poor | Poor | Satisfactory | 30 | 40.1 |
August 2014 | Poor | Poor | Poor | Satisfactory | 30 | 40.1 |
August 2012 | Poor | Poor | Poor | Satisfactory | 30 | 40.1 |
September 2010 | Poor | Poor | Poor | Satisfactory | 30 | 40.1 |
September 2008 | Poor | Poor | Fair | Satisfactory | 30 | 48.4 |
September 2006 | Fair | Fair | Satisfactory | Satisfactory | 30 | 61.6 |
November 2004 | Fair | Fair | Satisfactory | Satisfactory | 30 | 61.6 |
September 2002 | Fair | Fair | Satisfactory | Satisfactory | 30 | 54.0 |
August 2000 | Fair | Satisfactory | Satisfactory | Satisfactory | 30 | 55.0 |
September 1998 | Fair | Satisfactory | Satisfactory | Satisfactory | 30 | 51.0 |
October 1996 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 67.3 |
November 1994 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 67.4 |
September 1992 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 67.4 |
October 1990 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 67.4 |