Share:

NFA A053 over LITTLE BALD CREEK

Map

Coordinates:
+36.03990, -82.46513
36°02'24" N, 82°27'54" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:NFA A053 over LITTLE BALD CREEK
Structure number:860A0530003
Location:S. OF SR 36
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:15.1 ft. [4.6 m]
Total length:33.1 ft. [10.1 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:26.2 ft. [8.0 m]
Owner:County Highway Agency [02]
Year built:1983
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: August 2018

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:160 [as of 2019]
Truck traffic:5% of total traffic
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:79.3
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$80,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
August 2018Good7 out of 1016079.3
August 2016Good7 out of 1016079.3
August 2014Good7 out of 1016079.3
August 2012Good7 out of 1016079.3
September 2010Good7 out of 1016079.3
September 2008Good7 out of 1016079.3
September 2006Good7 out of 1016079.3
November 2004Good7 out of 1016079.3
September 2002Good7 out of 1016079.3
August 2000Good7 out of 1016082.3
September 1998Good7 out of 1016082.3
October 1996Good7 out of 109093.2
November 1994Good7 out of 109093.3
September 1992Good7 out of 109093.3
October 1990Good7 out of 109093.3