NFA A328 over BEECH LOG CREEK
Map
Coordinates:
+36.09538, -86.1404536°05'43" N, 86°08'26" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | NFA A328 over BEECH LOG CREEK |
Structure number: | 950A3280001 |
Location: | 0.1 SOUTH OF SR26 |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 29.9 ft. [9.1 m] |
Total length: | 65.9 ft. [20.1 m] |
Roadway width between curbs: | 22.0 ft. [6.7 m] |
Deck width edge-to-edge: | 25.9 ft. [7.9 m] |
Skew angle: | 10° |
Owner: | City or Municipal Highway Agency [04] |
Year built: | 1914 |
Year reconstructed: | 1986 |
Historic significance: | Historical significance is not determinable at this time [4] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 2 |
Main spans material: | Concrete [1] |
Main spans design: | Arch - Deck [11] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: May 2018
Good/Fair/Poor Condition: | Good |
Status: | Open, no restriction [A] |
Average daily traffic: | 1,210 [as of 2019] |
Truck traffic: | 2% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Better than present minimum criteria [7] |
Deck geometry appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Water adequacy appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 76.6 |
Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
Estimated cost of work: | $259,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2018 | Good | Good | Good | Good | 1210 | 76.6 |
May 2016 | Good | Good | Good | Good | 1210 | 76.6 |
May 2014 | Good | Good | Good | Good | 1210 | 76.6 |
May 2012 | Good | Good | Good | Good | 1210 | 76.6 |
June 2010 | Good | Good | Good | Good | 1210 | 79.6 |
June 2008 | Good | Good | Good | Good | 1210 | 79.6 |
June 2006 | Good | Good | Good | Good | 1210 | 79.6 |
July 2004 | Good | Good | Good | Good | 1210 | 79.6 |
June 2002 | Good | Good | Good | Good | 1210 | 79.6 |
September 2000 | Good | Good | Good | Good | 1210 | 79.6 |
August 1998 | Good | Good | Good | Good | 1210 | 79.6 |
July 1996 | Good | Good | Good | Good | 300 | 74.9 |
June 1994 | Good | Good | Good | Good | 300 | 73.4 |
August 1992 | Good | Good | Good | Good | 300 | 73.4 |
August 1990 | Good | Good | Good | Good | 300 | 73.4 |