Share:

CR 270 - PCT 1 over TRIB TO N BOSQUE RIVER

Map

Coordinates:
+32.03594, -98.10858
32°02'09" N, 98°06'31" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:CR 270 - PCT 1 over TRIB TO N BOSQUE RIVER
Structure number:020730AA0270002
Location:.5 MI S SH 6 IN CLAIRETTE
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:29.9 ft. [9.1 m]
Total length:60.0 ft. [18.3 m]
Roadway width between curbs:12.8 ft. [3.9 m]
Deck width edge-to-edge:12.8 ft. [3.9 m]
Owner:County Highway Agency [02]
Year built:1942
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: June 2016

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:490 [as of 2016]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:70.2
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$3,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
June 2016FairSatisfactorySatisfactorySatisfactory49070.2
June 2014FairSatisfactorySatisfactorySatisfactory49070.2
June 2012FairSatisfactorySatisfactorySatisfactory49070.2
June 2010FairSatisfactorySatisfactorySatisfactory49070.4
June 2008FairSatisfactorySatisfactorySatisfactory49070.4
June 2006FairSatisfactorySatisfactorySatisfactory49070.4
June 2004FairSatisfactorySatisfactorySatisfactory5072.5
June 2002FairSatisfactorySatisfactorySatisfactory5072.5
June 2000FairSatisfactorySatisfactoryFair5055.9
June 1998FairSatisfactorySatisfactoryFair5055.9
August 1996FairSatisfactorySatisfactoryFair5055.9
June 1994PoorSatisfactorySatisfactoryPoor5042.9
April 1992FairVery GoodSatisfactorySatisfactory5066.5
February 1992FairSatisfactoryGoodSatisfactory5066.5