Share:

US 83 over DBL MTN FRK BRAZOS RIVER

Map

Coordinates:
+33.00865, -100.18118
33°00'31" N, 100°10'52" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:US 83 over DBL MTN FRK BRAZOS RIVER
Structure number:082170003301020
Location:9.10 MI S OF US 380
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:52.2 ft. [15.9 m]
Total length:416.0 ft. [126.8 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:33.5 ft. [10.2 m]
Owner:State Highway Agency [01]
Year built:1935
Year reconstructed:1959
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:M 13.5 / H 15 [2]
Number of main spans:8
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: March 2017

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:1,380 [as of 2013]
Truck traffic:25% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:40.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$756,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
March 2017PoorFairFairPoor138040.6
March 2015PoorFairFairPoor138040.1
May 2013FairFairFairFair70066.1
May 2011FairFairFairFair150058.2
May 2009FairFairFairFair140058.9
March 2007FairFairFairFair149064.2
March 2005FairFairFairFair140064.5
March 2003FairFairFairFair145063.1
March 2001FairFairFairFair135063.4
May 1999FairFairFairFair135063.4
June 1997PoorFairSatisfactoryPoor150028.7
June 1995FairFairSatisfactoryFair160047.7
March 1993PoorPoorFairFair140054.5
December 1990FairFairSatisfactoryGood170067.7