Share:

IH 10 EB over PEACH CREEK

Map

Coordinates:
+29.69231, -97.23103
29°41'32" N, 97°13'52" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:IH 10 EB over PEACH CREEK
Structure number:130900053505168
Location:1.30 MI E OF US 90
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Rural) [01]
Length of largest span:44.0 ft. [13.4 m]
Total length:219.2 ft. [66.8 m]
Roadway width between curbs:42.0 ft. [12.8 m]
Deck width edge-to-edge:44.3 ft. [13.5 m]
Skew angle:45°
Owner:State Highway Agency [01]
Year built:1971
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Concrete [1]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: January 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:14,660 [as of 2013]
Truck traffic:28% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Equal to present desirable criteria [8]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:93.3

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
January 2017FairGoodGoodSatisfactory1466093.3
January 2015FairVery GoodGoodSatisfactory1466093.2
February 2013FairVery GoodGoodSatisfactory1167093.5
February 2011FairGoodGoodSatisfactory1180095.9
March 2009FairGoodGoodSatisfactory1252095.8
March 2007GoodGoodGoodGood1000096.1
April 2005GoodVery GoodGoodGood1000097.1
March 2003GoodGoodGoodGood1000097.1
March 2001GoodGoodGoodGood1000097.1
July 1999GoodGoodGoodGood945097.1
June 1997GoodGoodGoodGood850097.2
July 1995GoodGoodVery GoodGood770097.4
March 1993GoodGoodVery GoodGood830097.4
December 1990GoodVery GoodVery GoodGood795097.4

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Reinforced Concrete Abutmentlinear ft.126117900
Reinforced Concrete Pier Caplinear ft.2522341440
Joints
Pourable Jointlinear ft.378378000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.220220000
Steel Protective Coatingsq. ft.4,9954,995000
Reinforced Concrete Bridge Raillinear ft.220220000