Share:

SH 105 over TRINITY RIVER RELIEF

Map

Coordinates:
+30.27940, -94.80490
30°16'46" N, 94°48'18" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SH 105 over TRINITY RIVER RELIEF
Structure number:201460095101005
Location:4.5 MI NW OF SH 146
Purpose:Carries highway over relief for waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:40.0 ft. [12.2 m]
Total length:799.9 ft. [243.8 m]
Roadway width between curbs:34.5 ft. [10.5 m]
Deck width edge-to-edge:37.4 ft. [11.4 m]
Owner:State Highway Agency [01]
Year built:1968
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:M 18 / H 20 [4]
Number of main spans:20
Main spans material:Concrete [1]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: February 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:5,080 [as of 2013]
Truck traffic:21% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:77.7

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
February 2018FairSatisfactoryGoodGood508077.7
February 2016FairSatisfactoryGoodGood508068.2
March 2014FairSatisfactoryGoodGood410072.8
March 2012FairSatisfactoryGoodGood410074.3
April 2010FairSatisfactoryGoodGood390075.2
April 2008FairSatisfactoryGoodGood370079.5
June 2006FairSatisfactoryGoodGood430077.9
February 2005GoodGoodGoodGood430078.9
April 2003GoodGoodGoodGood370080.2
October 2001GoodGoodGoodGood390079.7
June 1999GoodGoodGoodGood310081.9
May 1997GoodGoodGoodGood310076.3
July 1994GoodGoodGoodVery Good260075.8
August 1991GoodVery GoodVery GoodVery Good270083.6

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Reinforced Concrete Abutmentlinear ft.7468600
Reinforced Concrete Pier Caplinear ft.6465895700
Joints
Pourable Jointlinear ft.7777604013
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.1,6161,616000
Steel Protective Coatingsq. ft.19,98019,980000