Craigs Crk Rd 615 over Mill Creek
Map
Coordinates:
+37.56147, -80.0423437°33'41" N, 80°02'32" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | Craigs Crk Rd 615 over Mill Creek |
Structure number: | 000000000005503 |
Location: | 0.37-Rte608;0.62-Rte606 |
Purpose: | Carries highway over waterway |
Route classification: | Major Collector (Rural) [07] |
Length of largest span: | 32.2 ft. [9.8 m] |
Total length: | 34.1 ft. [10.4 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 28.9 ft. [8.8 m] |
Skew angle: | 30° |
Owner: | State Highway Agency [01] |
Year built: | 1948 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18+Mod / HS 20+Mod [6] |
Main span material: | Concrete [1] |
Main span design: | Tee beam [04] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: October 2018
Good/Fair/Poor Condition: | Fair |
Status: | Posted for load [P] |
Average daily traffic: | 559 [as of 2014] |
Truck traffic: | 4% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Better than present minimum criteria [7] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 70.6 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $628,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
October 2018 | Fair | Satisfactory | Satisfactory | Good | 559 | 70.6 |
October 2017 | Fair | Satisfactory | Satisfactory | Good | 559 | 70.6 |
October 2016 | Fair | Satisfactory | Satisfactory | Good | 559 | 70.6 |
October 2015 | Fair | Satisfactory | Satisfactory | Good | 559 | 70.6 |
October 2014 | Fair | Satisfactory | Good | Good | 570 | 70.6 |
October 2013 | Good | Good | Good | Good | 570 | 70.6 |
October 2012 | Good | Good | Good | Good | 570 | 70.6 |
October 2010 | Good | Good | Good | Good | 570 | 78.3 |
October 2008 | Good | Good | Good | Good | 570 | 78.3 |
October 2006 | Good | Good | Good | Good | 610 | 81.3 |
October 2004 | Good | Good | Good | Good | 527 | 78.3 |
October 2002 | Good | Good | Good | Good | 559 | 78.3 |
October 2000 | Good | Good | Good | Good | 441 | 78.3 |
November 1999 | Poor | Good | Poor | Poor | 441 | 53.3 |
October 1998 | Fair | Good | Satisfactory | Satisfactory | 429 | 80.5 |
October 1997 | Fair | Good | Satisfactory | Satisfactory | 414 | 80.5 |
October 1995 | Fair | Good | Satisfactory | Satisfactory | 429 | 79.5 |
November 1994 | Fair | Good | Satisfactory | Satisfactory | 613 | 78.2 |
November 1993 | Fair | Good | Fair | Satisfactory | 613 | 67.2 |
September 1991 | Fair | Good | Fair | Fair | 349 | 62.2 |
August 1990 | Fair | Good | Fair | Fair | 349 | 63.2 |