Share:

ROUTE 0227 over URBANNA CREEK

Map

Coordinates:
+37.63066, -76.57190
37°37'50" N, 76°34'19" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:ROUTE 0227 over URBANNA CREEK
Structure number:000000000012088
Location:0.0M SCLURBANA-2.4M RTE33
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:49.9 ft. [15.2 m]
Total length:1052.9 ft. [320.9 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:32.5 ft. [9.9 m]
Vertical clearance below bridge:19.7 ft. [6.0 m]
Owner:State Highway Agency [01]
Year built:1957
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 13.5 / HS 15 [3]
Number of main spans:21
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

Latest Available Inspection: July 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:3,065 [as of 2014]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:61.8
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$1,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
July 2018FairFairFairFair306561.8
July 2016FairFairFairFair306561.8
July 2014FairFairFairFair370061.1
July 2012FairSatisfactoryGoodSatisfactory370073.8
July 2010FairSatisfactoryGoodSatisfactory370073.8
July 2008FairSatisfactoryGoodSatisfactory370073.8
July 2006FairSatisfactoryGoodSatisfactory412373.5
July 2004FairSatisfactoryGoodSatisfactory323474.2
July 2002FairSatisfactoryGoodSatisfactory323474.2
July 2000FairSatisfactoryGoodSatisfactory323477.2
July 1998FairSatisfactoryGoodSatisfactory323476.2
September 1996FairSatisfactoryGoodSatisfactory560075.2
July 1994FairSatisfactoryGoodSatisfactory550075.1
August 1993FairSatisfactoryGoodSatisfactory565475.0
August 1992FairSatisfactoryGoodSatisfactory532575.3
July 1990FairSatisfactoryGoodSatisfactory532575.3