BLUE RIDGE PARKWAY over OTTER CREEK
Map
Coordinates:
+37.56861, -79.3530837°34'07" N, 79°21'11" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | BLUE RIDGE PARKWAY over OTTER CREEK |
Structure number: | 5140015P0000000 |
Location: | 1.8 MILES TO VA ROUTE 501 |
Purpose: | Carries highway over waterway |
Route classification: | Minor Collector (Rural) [08] |
Length of largest span: | 40.0 ft. [12.2 m] |
Total length: | 148.0 ft. [45.1 m] |
Roadway width between curbs: | 30.2 ft. [9.2 m] |
Deck width edge-to-edge: | 35.4 ft. [10.8 m] |
Skew angle: | 45° |
Owner: | National Park Service [66] |
Year built: | 1958 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 4 |
Main spans material: | Concrete continuous [2] |
Main spans design: | Tee beam [04] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: August 2018
Good/Fair/Poor Condition: | Fair |
Status: | Posted for other load-capacity restriction [R] |
Average daily traffic: | 474 [as of 2012] |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Equal to present minimum criteria [6] |
Deck geometry appraisal: | Equal to present minimum criteria [6] |
Water adequacy appraisal: | Superior to present desirable criteria [9] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 84.1 |
Estimated cost of work: | $165,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
August 2018 | Fair | Satisfactory | Satisfactory | Good | 474 | 84.1 |
November 2016 | Fair | Satisfactory | Satisfactory | Good | 474 | 78.1 |
October 2014 | Fair | Satisfactory | Satisfactory | Good | 474 | 81.5 |
October 2012 | Fair | Satisfactory | Satisfactory | Good | 474 | 81.5 |
October 2010 | Fair | Satisfactory | Satisfactory | Good | 474 | 81.5 |
September 2008 | Fair | Satisfactory | Satisfactory | Good | 474 | 84.5 |
October 2006 | Fair | Satisfactory | Good | Good | 474 | 75.5 |
November 2004 | Fair | Satisfactory | Good | Good | 474 | 75.3 |
September 2004 | Fair | Satisfactory | Good | Good | 474 | 75.3 |
September 2002 | Fair | Satisfactory | Good | Good | 474 | 75.5 |
November 2000 | Fair | Satisfactory | Good | Good | 474 | 83.5 |
August 1998 | Fair | Satisfactory | Good | Very Good | 474 | 83.5 |