US 101 over SOL DUC RIVER
Map
Coordinates:
+48.06619, -124.0975048°03'58" N, 124°05'51" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | US 101 over SOL DUC RIVER |
Structure number: | 0003372B0000000 |
Location: | 8.6 N JCT SR 113 |
Purpose: | Carries highway and pedestrian walkway over waterway |
Route classification: | Principal Arterial - Other (Rural) [02] |
Length of largest span: | 160.1 ft. [48.8 m] |
Total length: | 336.0 ft. [102.4 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 24.9 ft. [7.6 m] |
Vertical clearance above deck: | 14.8 ft. [4.5 m] |
Owner: | State Highway Agency [01] |
Year built: | 1948 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: June 2017
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 2,604 [as of 2015] |
Truck traffic: | 15% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Scour condition: | Bridge is scour critical; bridge foundations determined to be unstable. [3] |
Sufficiency rating: | 61.3 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Estimated cost of work: | $4,838,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
June 2017 | Fair | Good | Satisfactory | Good | 2604 | 61.3 |
June 2015 | Fair | Good | Satisfactory | Good | 2275 | 61.1 |
June 2013 | Fair | Satisfactory | Satisfactory | Good | 2495 | 61.0 |
June 2011 | Fair | Satisfactory | Satisfactory | Good | 2495 | 59.0 |
June 2009 | Fair | Satisfactory | Satisfactory | Satisfactory | 2149 | 55.1 |
July 2007 | Fair | Satisfactory | Satisfactory | Satisfactory | 2724 | 54.9 |
August 2005 | Fair | Satisfactory | Satisfactory | Satisfactory | 2724 | 54.9 |
August 2003 | Fair | Satisfactory | Satisfactory | Satisfactory | 2724 | 54.9 |
October 2001 | Fair | Satisfactory | Satisfactory | Satisfactory | 2724 | 55.9 |
October 1999 | Poor | Satisfactory | Satisfactory | Serious | 2698 | 12.3 |
September 1997 | Poor | Satisfactory | Satisfactory | Serious | 2698 | 7.2 |
April 1995 | Fair | Satisfactory | Satisfactory | Good | 2698 | 48.3 |
February 1993 | Fair | Satisfactory | Satisfactory | Satisfactory | 3079 | 48.1 |
November 1991 | Fair | Satisfactory | Good | Satisfactory | 3079 | 48.1 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Reinforced Concrete Girder/Beam | linear ft. | 704 | 703 | 0 | 1 | 0 |
Steel Stringer | linear ft. | 1,120 | 1,119 | 0 | 1 | 0 |
Steel Protective Coating | sq. ft. | 5,380 | 4,989 | 0 | 244 | 147 |
Deck |
Reinforced Concrete Deck | sq. ft. | 8,064 | 8,060 | 0 | 0 | 4 |
Wearing Surfaces | sq. ft. | 8,064 | 0 | 8,064 | 0 | 0 |
Superstructure |
Steel Truss | linear ft. | 320 | 140 | 0 | 180 | 0 |
Steel Protective Coating | sq. ft. | 15,372 | 14,257 | 0 | 697 | 418 |
Steel Floor Beam | linear ft. | 270 | 269 | 0 | 1 | 0 |
Steel Protective Coating | sq. ft. | 1,297 | 1,202 | 0 | 58 | 37 |
Steel Gusset Plate | each | 32 | 32 | 0 | 0 | 0 |
Substructure |
Reinforced Concrete Abutment | linear ft. | 60 | 60 | 0 | 0 | 0 |
Reinforced Concrete Pile | each | 12 | 11 | 0 | 1 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 60 | 60 | 0 | 0 | 0 |
Joints |
Strip Seal Joint | linear ft. | 48 | 0 | 0 | 0 | 48 |
Open Joint | linear ft. | 216 | 0 | 0 | 0 | 216 |
Bearings |
Movable Bearing | each | 4 | 4 | 0 | 0 | 0 |
Fixed Bearing | each | 2 | 2 | 0 | 0 | 0 |
Bridge Rail |
Steel or Aluminum Bridge Rail | linear ft. | 320 | 320 | 0 | 0 | 0 |
Reinforced Concrete Bridge Rail | linear ft. | 352 | 352 | 0 | 0 | 0 |