Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | SR 3 over SHERWOOD CREEK |
Structure number: | 0004133A0000000 |
Location: | 20.5 N JCT US 101 |
Purpose: | Carries highway and pedestrian walkway over waterway |
Route classification: | Principal Arterial - Other (Rural) [02] |
Length of largest span: | 56.1 ft. [17.1 m] |
Total length: | 147.0 ft. [44.8 m] |
Roadway width between curbs: | 25.9 ft. [7.9 m] |
Deck width edge-to-edge: | 33.8 ft. [10.3 m] |
Owner: | State Highway Agency [01] |
Year built: | 1952 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Number of main spans: | 3 |
Main spans material: | Concrete continuous [2] |
Main spans design: | Tee beam [04] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: February 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 9,503 [as of 2016] |
Truck traffic: | 8% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Equal to present minimum criteria [6] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection has failed. River control devices have been destroyed. Stream bed aggradation, degradation or lateral movement has changed the channel to now threaten the bridge and/or approach roadway. [3] |
Scour condition: | Bridge is scour critical; bridge foundations determined to be unstable. [3] |
Sufficiency rating: | 65.3 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Estimated cost of work: | $2,234,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
February 2018 | Fair | Satisfactory | Good | Satisfactory | 9503 | 65.3 |
February 2016 | Fair | Satisfactory | Good | Satisfactory | 8335 | 65.2 |
February 2014 | Fair | Satisfactory | Good | Satisfactory | 8335 | 65.2 |
February 2012 | Fair | Satisfactory | Satisfactory | Fair | 8782 | 54.2 |
March 2010 | Fair | Satisfactory | Satisfactory | Fair | 9425 | 54.2 |
February 2008 | Fair | Satisfactory | Satisfactory | Fair | 8592 | 52.2 |
March 2006 | Fair | Satisfactory | Satisfactory | Fair | 8920 | 52.2 |
March 2004 | Fair | Satisfactory | Satisfactory | Fair | 8920 | 52.2 |
July 2002 | Fair | Satisfactory | Satisfactory | Fair | 8920 | 52.2 |
September 2000 | Fair | Satisfactory | Satisfactory | Fair | 8920 | 53.2 |
April 1998 | Fair | Satisfactory | Satisfactory | Fair | 8920 | 54.2 |
March 1996 | Fair | Satisfactory | Satisfactory | Satisfactory | 4116 | 61.6 |
March 1994 | Fair | Satisfactory | Satisfactory | Satisfactory | 2750 | 64.9 |
October 1992 | Fair | Satisfactory | Satisfactory | Satisfactory | 2750 | 73.1 |
April 1990 | Poor | Poor | Poor | Satisfactory | 2750 | 38.3 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Reinforced Concrete Girder/Beam | linear ft. | 556 | 556 | 0 | 0 | 0 |
Deck |
Reinforced Concrete Deck | sq. ft. | 3,822 | 3,818 | 0 | 0 | 4 |
Wearing Surfaces | sq. ft. | 3,822 | 0 | 3,822 | 0 | 0 |
Substructure |
Reinforced Concrete Abutment | linear ft. | 68 | 68 | 0 | 0 | 0 |
Reinforced Concrete Pile Cap/Footing | linear ft. | 1 | 1 | 0 | 0 | 0 |
Reinforced Concrete Pile | each | 8 | 6 | 0 | 2 | 0 |
Joints |
Open Joint | linear ft. | 52 | 0 | 52 | 0 | 0 |
Bridge Rail |
Steel or Aluminum Bridge Rail | linear ft. | 294 | 294 | 0 | 0 | 0 |
Reinforced Concrete Bridge Rail | linear ft. | 294 | 294 | 0 | 0 | 0 |