Name:SR 285 over WENATCHEE RIVER & BNSF
Structure number:083730000000000
Location:4.4 N JCT SR 28
Purpose:Carries highway and pedestrian walkway over railroad and waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:259.9 ft. [79.2 m]
Total length:641.1 ft. [195.4 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:37.1 ft. [11.3 m]
Vertical clearance below bridge:26.6 ft. [8.1 m]
Owner:State Highway Agency [01]
Year built:1933
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Truss - Deck [09]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: April 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:17,912 [as of 2012]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:45.9 tons [41.7 metric tons]
Inventory rating:27.0 tons [24.5 metric tons]
Sufficiency rating:57.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$9,487,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
April 201757.8FairSatisfactorySatisfactorySatisfactory-17912
April 201557.5FairSatisfactorySatisfactorySatisfactory-17912
April 201357.5FairSatisfactorySatisfactorySatisfactory-17845
May 201165.3FairSatisfactorySatisfactorySatisfactory-17845
May 200964.2FairSatisfactorySatisfactoryGood-19300
April 200767.9FairSatisfactorySatisfactoryGood-14468
October 200567.9FairSatisfactorySatisfactoryGood-14468
September 200367.9FairSatisfactorySatisfactoryGood-14468
July 200267.9FairSatisfactorySatisfactoryGood-14468
August 200167.9FairSatisfactorySatisfactoryGood-14468
September 199968.9FairSatisfactorySatisfactoryGood-14468
September 199745.1FairSatisfactoryGoodGood-14468
September 199545.5FairSatisfactoryGoodGood-14468
September 199345.5FairSatisfactoryGoodGood-21000
October 199146.5GoodVery GoodGoodGood-21000