E. MARKET ST. over WISHKAH RIVER
Map
Coordinates:
+46.98500, -123.8050046°59'06" N, 123°48'18" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | E. MARKET ST. over WISHKAH RIVER |
Structure number: | 085264000000000 |
Location: | YOUNG STREET |
Purpose: | Carries highway and pedestrian walkway over waterway |
Route classification: | Collector (Urban) [17] |
Length of largest span: | 79.1 ft. [24.1 m] |
Total length: | 304.1 ft. [92.7 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 30.8 ft. [9.4 m] |
Owner: | City or Municipal Highway Agency [04] |
Year built: | 1956 |
Historic significance: | Historical significance is not determinable at this time [4] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 6 |
Main spans material: | Prestressed concrete [5] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Latex Concrete or similar additive [3] |
Latest Available Inspection: May 2017
Good/Fair/Poor Condition: | Fair |
Status: | Posted for load [P] |
Average daily traffic: | 1,270 [as of 2010] |
Truck traffic: | 5% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4] |
Sufficiency rating: | 30.1 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Estimated cost of work: | $4,378,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2017 | Fair | Satisfactory | Fair | Satisfactory | 1270 | 30.1 |
May 2015 | Fair | Satisfactory | Satisfactory | Satisfactory | 1270 | 39.3 |
July 2013 | Fair | Satisfactory | Satisfactory | Satisfactory | 1270 | 39.3 |
May 2011 | Fair | Satisfactory | Satisfactory | Satisfactory | 1270 | 39.3 |
June 2009 | Fair | Satisfactory | Satisfactory | Satisfactory | 1270 | 13.7 |
June 2007 | Fair | Satisfactory | Satisfactory | Satisfactory | 1270 | 13.7 |
June 2005 | Fair | Satisfactory | Satisfactory | Satisfactory | 1270 | 13.7 |
August 2003 | Fair | Satisfactory | Satisfactory | Satisfactory | 1270 | 13.7 |
August 2001 | Fair | Satisfactory | Satisfactory | Satisfactory | 1270 | 13.7 |
July 1999 | Fair | Satisfactory | Satisfactory | Satisfactory | 1270 | 13.7 |
October 1997 | Fair | Good | Good | Satisfactory | 2760 | 61.0 |
November 1993 | Good | Good | Good | Good | 2760 | 61.0 |
July 1991 | Good | Good | Good | Good | 2760 | 58.0 |