McMANN CREEK ROAD over SAN POIL RIVER
Map
Coordinates:
+48.56349, -118.7421248°33'49" N, 118°44'32" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | McMANN CREEK ROAD over SAN POIL RIVER |
Structure number: | 087048000000000 |
Location: | .17 E SR20 |
Purpose: | Carries highway and pedestrian walkway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 48.9 ft. [14.9 m] |
Total length: | 49.9 ft. [15.2 m] |
Roadway width between curbs: | 14.8 ft. [4.5 m] |
Deck width edge-to-edge: | 15.7 ft. [4.8 m] |
Skew angle: | 30° |
Owner: | County Highway Agency [02] |
Year built: | 1953 |
Year reconstructed: | 2004 |
Historic significance: | Historical significance is not determinable at this time [4] |
Design load: | MS 18 / HS 20 [5] |
Main span material: | Wood or timber [7] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Wood or Timber [7] |
Latest Available Inspection: August 2018
Good/Fair/Poor Condition: | Fair |
Status: | Posted for load [P] |
Average daily traffic: | 9 [as of 2018] |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Good [7 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Equal to present minimum criteria [6] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 64.2 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $1,248,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
August 2018 | Fair | Good | Good | Satisfactory | 9 | 64.2 |
June 2016 | Fair | Very Good | Good | Satisfactory | 8 | 62.3 |
June 2014 | Fair | Very Good | Good | Satisfactory | 8 | 62.3 |
June 2012 | Fair | Very Good | Good | Satisfactory | 8 | 62.3 |
May 2010 | Fair | Very Good | Good | Satisfactory | 8 | 62.3 |
July 2008 | Fair | Very Good | Good | Satisfactory | 7 | 62.3 |
April 2003 | Fair | Fair | - | - | 7 | 0.0 |