Share:

CTH D FISH HATCH over MURPHY CREEK

Map

Coordinates:
+42.96689, -89.60022
42°58'01" N, 89°36'01" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:CTH D FISH HATCH over MURPHY CREEK
Structure number:B13035100000000
Location:0.1M S JCT USH 151
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:34.1 ft. [10.4 m]
Total length:36.1 ft. [11.0 m]
Roadway width between curbs:54.1 ft. [16.5 m]
Deck width edge-to-edge:62.3 ft. [19.0 m]
Owner:County Highway Agency [02]
Year built:1985
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Concrete [1]
Main span design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: November 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:29,074 [as of 2015]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:75.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$371,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
November 2016FairSatisfactorySatisfactorySatisfactory2907475.9
November 2014FairSatisfactorySatisfactoryGood2730076.2
November 2012FairSatisfactorySatisfactoryGood2730076.2
November 2010FairSatisfactorySatisfactoryGood2730076.2
November 2008FairSatisfactorySatisfactoryGood2730076.2
November 2006FairSatisfactorySatisfactoryGood2730076.2
December 2004FairSatisfactorySatisfactoryGood2730076.2
December 2002FairSatisfactorySatisfactoryGood2210077.1
October 2000GoodGoodGoodVery Good2210077.1
December 1998GoodVery GoodVery GoodVery Good2210077.1
December 1996GoodVery GoodVery GoodVery Good2210077.1
November 1994GoodVery GoodVery GoodVery Good2210077.9
March 1992FairSatisfactoryVery GoodVery Good2210077.9
December 1990GoodVery GoodVery GoodVery Good2210077.9

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Deck
Reinforced Concrete Decksq. ft.2,2431,99125200
Substructure
Reinforced Concrete Abutmentlinear ft.124122200
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.7163800