Share:

LRD PINE LAKE RD over WOLF RIVER

Map

Coordinates:
+45.66083, -88.99475
45°39'39" N, 88°59'41" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:LRD PINE LAKE RD over WOLF RIVER
Structure number:P21090500000000
Location:2.9M S JCT STH 32
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:9.8 ft. [3.0 m]
Total length:36.1 ft. [11.0 m]
Owner:Town or Township Highway Agency [03]
Year built:1930
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Culvert [19]
Deck type:Corrugated Steel [6]
Wearing surface:Bituminous [6]

Latest Available Inspection: August 2018

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:60 [as of 2015]
Structural appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Culvert condition:Any condition described in Code 4 but which is excessive in scope. Severe movement or differential setlement of the segments or loss of fill. Holes may exist in walls or slabs. Integral wingwalls nearly severed from culvert. Severe scour or erosion at curtain walls, wingwalls or pipes. Metal culverts have extreme distortion and delection in one section, extensive corrosion, or deep pitting with scattered perforations. [3]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:40.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$179,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
August 2018Poor3 out of 106040.9
August 2017Poor4 out of 106054.7
August 2016Poor4 out of 106054.7
August 2015Poor4 out of 106054.7
August 2014Poor4 out of 106054.7
August 2012Poor4 out of 106062.5
September 2010Poor4 out of 105162.5
September 2008Poor4 out of 105162.5
September 2006Poor4 out of 105162.5
October 2004Fair6 out of 105189.5
August 2002Fair6 out of 105189.5
September 2000Fair6 out of 108089.5
September 1998Fair6 out of 108089.5
October 1996Fair6 out of 108089.5
September 1994Fair6 out of 108089.5
September 1992Fair6 out of 108089.5
August 1990Fair6 out of 108077.9