LRD ELM RD over DILL CREEK
Map
Coordinates:
+44.85953, -90.2385244°51'34" N, 90°14'19" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | LRD ELM RD over DILL CREEK |
Structure number: | P37028900000000 |
Location: | 3.9M S JCT CTH N |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 69.9 ft. [21.3 m] |
Total length: | 73.5 ft. [22.4 m] |
Roadway width between curbs: | 21.7 ft. [6.6 m] |
Deck width edge-to-edge: | 22.6 ft. [6.9 m] |
Skew angle: | 20° |
Owner: | Town or Township Highway Agency [03] |
Year built: | 1937 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: August 2018
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 50 [as of 2015] |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Poor [4 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge is scour critical; bridge foundations determined to be unstable. [3] |
Sufficiency rating: | 54.5 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $310,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
August 2018 | Poor | Satisfactory | Satisfactory | Poor | 50 | 54.5 |
August 2017 | Poor | Satisfactory | Satisfactory | Poor | 50 | 54.5 |
August 2016 | Poor | Satisfactory | Satisfactory | Poor | 50 | 54.5 |
October 2015 | Poor | Satisfactory | Satisfactory | Poor | 50 | 54.5 |
October 2014 | Poor | Satisfactory | Satisfactory | Poor | 50 | 54.5 |
October 2012 | Fair | Satisfactory | Satisfactory | Fair | 40 | 46.2 |
October 2010 | Fair | Satisfactory | Satisfactory | Fair | 40 | 42.2 |
November 2008 | Fair | Satisfactory | Satisfactory | Fair | 40 | 42.2 |
November 2006 | Fair | Satisfactory | Satisfactory | Satisfactory | 40 | 52.2 |
November 2004 | Fair | Satisfactory | Satisfactory | Satisfactory | 40 | 52.2 |
November 2002 | Fair | Satisfactory | Satisfactory | Satisfactory | 40 | 52.2 |
July 2000 | Fair | Satisfactory | Satisfactory | Satisfactory | 40 | 56.2 |
November 1998 | Fair | Satisfactory | Satisfactory | Satisfactory | 40 | 52.2 |
July 1996 | Fair | Good | Satisfactory | Satisfactory | 40 | 56.2 |
October 1994 | Fair | Good | Satisfactory | Satisfactory | 40 | 55.3 |
October 1992 | Fair | Satisfactory | Satisfactory | Satisfactory | 40 | 55.3 |
October 1990 | Fair | Satisfactory | Satisfactory | Satisfactory | 40 | 55.3 |