Share:

LRD HONEY CREEK DR over HONEY CREEK

Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:LRD HONEY CREEK DR over HONEY CREEK
Structure number:P40057000000000
Location:0.1M S JCT USH 18
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:29.9 ft. [9.1 m]
Total length:29.9 ft. [9.1 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:59.4 ft. [18.1 m]
Owner:County Highway Agency [02]
Year built:1933
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Concrete [1]
Main span design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: September 2016 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:7,380 [as of 2015]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:78.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$291,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
September 201678.0FairFairFairFair-7380
September 201478.1FairFairFairFair-7200
September 201275.1FairFairFairFair-7200
September 201077.4FairFairFairFair-1500
August 200877.4FairFairSatisfactoryFair-1500
August 200689.4FairSatisfactorySatisfactorySatisfactory-1500
August 200489.4FairSatisfactorySatisfactorySatisfactory-1500
August 200289.4Fair-Satisfactory--1500
November 200089.3FairSatisfactorySatisfactorySatisfactory-1500
November 199889.3FairVery GoodSatisfactoryGood-1500
December 199689.3FairGoodSatisfactoryGood-1500
October 199489.4FairVery GoodSatisfactoryGood-1500
December 199289.4FairGoodSatisfactoryVery Good-1500
October 199089.4FairGoodSatisfactoryVery Good-1500