Facts 

Name:LRD MOILIEN HILL R over SPRING COULEE CREEK
Structure number:P62017700000000
Location:2.7M E JCT CTH P
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:26.9 ft. [8.2 m]
Total length:28.5 ft. [8.7 m]
Roadway width between curbs:19.7 ft. [6.0 m]
Deck width edge-to-edge:20.3 ft. [6.2 m]
Owner:Town or Township Highway Agency [03]
Year built:1981
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: May 2016 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:94 [as of 2015]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:46.8 tons [42.5 metric tons]
Inventory rating:28.5 tons [25.9 metric tons]
Sufficiency rating:92.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$152,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
May 201692.6FairSatisfactorySatisfactorySatisfactory-94
May 201489.6FairSatisfactorySatisfactorySatisfactory-80
May 201295.0FairGoodSatisfactoryGood-80
May 201095.0FairGoodSatisfactoryGood-80
May 200895.0FairGoodSatisfactoryGood-80
May 200695.0FairVery GoodSatisfactoryVery Good-80
May 200495.0FairVery GoodSatisfactoryVery Good-80
April 200295.0FairVery GoodSatisfactoryVery Good-80
April 200095.0FairVery GoodSatisfactoryVery Good-80
May 199895.0FairVery GoodSatisfactoryVery Good-80
June 199695.0GoodVery GoodVery GoodVery Good-80
April 199495.0GoodVery GoodVery GoodVery Good-80
May 199295.0GoodVery GoodVery GoodVery Good-80
October 199095.0GoodVery GoodVery GoodVery Good-80