CR 1/3 SLS over SLEEPY CREEK
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+39.64764, -78.1286739°38'52" N, 78°07'43" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | CR 1/3 SLS over SLEEPY CREEK |
Structure number: | 00000000033A003 |
Location: | 0.35 MI E OF CR 08 SLS |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 111.9 ft. [34.1 m] |
Total length: | 262.5 ft. [80.0 m] |
Roadway width between curbs: | 11.5 ft. [3.5 m] |
Deck width edge-to-edge: | 12.1 ft. [3.7 m] |
Vertical clearance above deck: | 9.2 ft. [2.8 m] |
Owner: | State Highway Agency [01] |
Year built: | 1911 |
Historic significance: | Bridge is possibly eligible for the National Register of Historic Places [3] |
Main span material: | Aluminum, Wrought Iron or Cast Iron [9] |
Main span design: | Truss - Thru [10] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Wood or Timber [7] |
Latest Available Inspection: June 2014
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 200 [as of 2011] |
Truck traffic: | 9% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Serious [3 out of 9] |
Substructure condition: | Poor [4 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of replacement [2] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Better than present minimum criteria [7] |
Roadway alignment appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 13.6 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $3,100,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
June 2014 | Poor | Satisfactory | Serious | Poor | 200 | 13.6 |
June 2013 | Poor | Satisfactory | Serious | Poor | 200 | 13.6 |
June 2012 | Poor | Satisfactory | Serious | Poor | 200 | 13.6 |
June 2011 | Poor | Satisfactory | Serious | Poor | 200 | 13.6 |
June 2010 | Poor | Satisfactory | Serious | Poor | 200 | 13.6 |
June 2009 | Poor | Good | Serious | Poor | 200 | 13.6 |
June 2008 | Poor | Good | Serious | Poor | 200 | 13.6 |
June 2007 | Poor | Good | Serious | Poor | 200 | 13.6 |
June 2006 | Poor | Good | Serious | Poor | 200 | 13.6 |
June 2005 | Poor | Good | Serious | Poor | 150 | 14.2 |
June 2004 | Poor | Good | Serious | Poor | 150 | 14.2 |
June 2003 | Poor | Good | Serious | Poor | 150 | 14.2 |
June 2002 | Poor | Good | Serious | Poor | 150 | 14.2 |
June 2001 | Poor | Good | Serious | Poor | 150 | 14.2 |
June 2000 | Poor | Good | Serious | Poor | 150 | 14.2 |
June 1999 | Poor | Very Good | Serious | Poor | 80 | 15.0 |
June 1998 | Poor | Very Good | Serious | Poor | 80 | 15.0 |
June 1997 | Poor | Serious | Serious | Fair | 500 | 0.0 |
June 1996 | Poor | Serious | Serious | Fair | 50 | 0.0 |
April 1995 | Poor | Serious | Serious | Fair | 50 | 0.0 |
June 1994 | Poor | Serious | Serious | Fair | 50 | 0.0 |
May 1993 | Poor | Serious | Serious | Fair | 50 | 0.0 |
June 1992 | Poor | Serious | Serious | Fair | 80 | 0.0 |
May 1991 | Poor | Critical | Serious | Serious | 50 | 15.4 |